Resource forecasting for architects
It is important to determine whether you will have the correct number and mix of people available to be able to deliver the work that has been accepted. Having adequate resources in place to provide clients with a professional service is a requirement of both the ARB and RIBA codes.
RIBA Guidance Note 2 & Guidance Note 4
- 2.4 "Members should ensure that they have, or will have when needed, the appropriate competence, skills and resources to meet the requirements of the work for which they are bidding".
- 4.4 "When accepting an appointment members should not undertake to provide services which they know, or ought to know, are beyond their competence or resources".
ARB Code: Standards of professional conduct and practice
- Standard 4: Competent management of your practice.4.3 "You should ensure that you are able to provide adequate professional, financial and technical resources when entering into a contract and throughout its duration. You should also, where appropriate, ensure you have sufficiently suitably qualified and supervised staff to provide an effective service to clients".
To determine if their will be enough staff for a project, start by producing a people allocation forecast. This shows how work has been allocated to each individual in the practice over the coming weeks. The people allocation forecast should take into account people away on study leave, holiday, sick leave and so on. These values are deducted in arriving at the people available total. This total can then be carried forward to a project resource forecast which compares the total practice requirement with total current availability in order to predict shortages or spare capacity.
A rolling weekly forecast can be produced of the number of people that will be needed on a project-by-project basis. This can then be compared with the total number of people available. From this report it can be seen where shortages or surpluses may occur.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.